Complos logo Complos

Alford Title 5 BOH submission

How Alford, Massachusetts accepts Title 5 inspection reports — submission method, the BOH contact on file, and what inspectors should expect. Free, no signup.

Submission method

How they accept reports
Unknown
County
Berkshire
Notes
Town domain did not resolve via the common MA-muni patterns. Auto-scraped 2026-05-12.

What to file

The MA Title 5 inspection report under 310 CMR 15.301 is a standardized MassDEP form. It must include: inspector identity + NEIWPCC certification, system age, septic tank construction details and condition, distribution box static-liquid level, soil absorption system observations, water-use history, failure indicators (effluent breakout, backups, ponding, soil saturation, system failure), inspector attestation, and a certification result (Pass / Conditional Pass / Further Evaluation / Fail).

Common rejection reasons

  • Illegible handwriting or scanned PDF quality below readable threshold.
  • Missing inspector attestation under 310 CMR 15.302.
  • D-box static-liquid level not reported.
  • Effluent breakout location not described in narrative.
  • Failure indicators ticked but inconsistent with the certification result.

Related guides

Faster filings with Complos

Want a MassDEP-faithful inspection report PDF, pre-checked against Alford's submission method on file, with the watershed overlay baked in? Start your 7-day Complos trial — no credit card required.