Complos logo Complos

Dover Title 5 BOH submission

How Dover, Massachusetts accepts Title 5 inspection reports — submission method, the BOH contact on file, and what inspectors should expect. Free, no signup.

Submission method

How they accept reports
Email
Contact email
[email protected]
Phone
413-784-9352
Portal
https://www.doverma.gov/171/Board-of-Health
County
Norfolk
Notes
verified department inbox ([email protected]). Staff: CP-FS (Health Director). Phones: (413) 784-9352, (800) 723-6695, 085-4220160. Domain: www.doverma.gov. Source: https://www.doverma.gov/171/Board-of-Health. Auto-scraped 2026-05-12.

What to file

The MA Title 5 inspection report under 310 CMR 15.301 is a standardized MassDEP form. It must include: inspector identity + NEIWPCC certification, system age, septic tank construction details and condition, distribution box static-liquid level, soil absorption system observations, water-use history, failure indicators (effluent breakout, backups, ponding, soil saturation, system failure), inspector attestation, and a certification result (Pass / Conditional Pass / Further Evaluation / Fail).

Common rejection reasons

  • Illegible handwriting or scanned PDF quality below readable threshold.
  • Missing inspector attestation under 310 CMR 15.302.
  • D-box static-liquid level not reported.
  • Effluent breakout location not described in narrative.
  • Failure indicators ticked but inconsistent with the certification result.

Related guides

Faster filings with Complos

Want a MassDEP-faithful inspection report PDF, pre-checked against Dover's submission method on file, with the watershed overlay baked in? Start your 7-day Complos trial — no credit card required.