Wakefield Title 5 BOH submission
How Wakefield, Massachusetts accepts Title 5 inspection reports — submission method, the BOH contact on file, and what inspectors should expect. Free, no signup.
Submission method
- How they accept reports
- Contact email
- [email protected]
- Phone
- 781-246-6300
- Portal
- https://www.wakefieldma.gov/205/Board-of-Health
- County
- Middlesex
- Notes
- verified mailto from the BOH page. Phones: (781) 246-6300, 1134480397, 1465647691. Domain: www.wakefieldma.gov. Source: https://www.wakefieldma.gov/205/Board-of-Health. Auto-scraped 2026-05-12.
What to file
The MA Title 5 inspection report under 310 CMR 15.301 is a standardized MassDEP form. It must include: inspector identity + NEIWPCC certification, system age, septic tank construction details and condition, distribution box static-liquid level, soil absorption system observations, water-use history, failure indicators (effluent breakout, backups, ponding, soil saturation, system failure), inspector attestation, and a certification result (Pass / Conditional Pass / Further Evaluation / Fail).
Common rejection reasons
- Illegible handwriting or scanned PDF quality below readable threshold.
- Missing inspector attestation under 310 CMR 15.302.
- D-box static-liquid level not reported.
- Effluent breakout location not described in narrative.
- Failure indicators ticked but inconsistent with the certification result.
Related guides
- Title 5 Inspection of a 1990s System: What Post-1995 Code Got Right and Where Time Catches Up
- Pre-1965 Cesspool Inspection in Massachusetts: When It Passes and When It Has to Go
- Title 5 PDF Binary Requirements: What MA Boards of Health Look at Before Logging the Submission
- Inspecting a 1980s Massachusetts Title 5 System: What to Look For When the As-Builts Are Missing
- Submitting a Title 5 Inspection in Springfield: Connecticut River Context and CSO Pressure
Faster filings with Complos
Want a MassDEP-faithful inspection report PDF, pre-checked against Wakefield's submission method on file, with the watershed overlay baked in? Start your 7-day Complos trial — no credit card required.